实验室项目前期建设管理思路——以南方科技大学医学院项目为例

Pre-construction Management Solutions for Laboratory Projects:Take the Project of the School of Medicine,Southern University of Science and Technology for Example
原文传递
导出
摘要 实验室项目是一种偏小众的建筑类型。南方科技大学医学院项目功能庞杂,机电系统复合,工期紧张。文章以南方科技大学医学院项目为例提出了实验室项目从前期立项、规模论证、设计深化、进度把控及管理模式等方面的建议,为后续同类型项目提供高质量发展经验。 Laboratory construction is a niche project.Regarding the project of the School of Medicine at Southern University of Science and Technology,it was characterized by complex functions,complicated electromechanical systems,and a tight project schedule.This study took this project for example to propose suggestions on various aspects including early project approval,project scale demonstration,detailed project design,project progress control,and project management modes.In this way,it is expected to provide useful experience for subsequent similar projects.
作者 于婉红 YU Wanhong(Futian District Development and Reform Bureau of Shenzhen City,Shenzhen 518000,China)
出处 《建筑设计管理》 2024年第4期19-26,共8页 Architectural Design Management
关键词 实验室建设 实验室管理 发展建议 管理模式 laboratory construction laboratory management development suggestions management mode
  • 相关文献

参考文献3

二级参考文献30

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部