“站桥合一”工程中地铁车站的墙-柱荷载分配计算

Wall-Column Load Distribution Calculation in Subway Station Structures in Station-Bridge Co-Construction Project
下载PDF
导出
摘要 在轨道交通“站桥合一”的工程建设中,桥梁荷载在地铁车站结构的侧墙和框架柱上的分配分析是设计计算的一个关键内容。对软土地区“站桥合一”工程中典型的两层双柱三跨矩形框架地铁车站的墙-柱荷载分配分析方法进行了研究,提出了一个适用于软土地区的地铁车站墙-柱荷载分配分析的简化力学模型,给出了墙-柱荷载分配系数B(柱荷载与桥梁荷载的比值)的解析解。采用该解析解,可以确定不同的桥台刚度、地铁车站刚度和桥墩间距下,地铁车站的侧墙与框架柱的荷载分配。并通过有限元方法验证了该简化分析法的可靠性。 In rail transit,the analysis of the bridge load distribution on the side walls and columns in subway station structures is a key factor in the design of station-bridge co-construction projects.In this paper,a simplified analysis model of the wall-column load distribution for a typical two-story,two-column,three-span rectangular frame subway station in a station-bridge co-construction project is investigated,and an analytical solution for the load distribution factor B(ratio of column load to bridge load)is presented.Using the proposed solution,the load distribution between the side wall and the column can be determined according to the stiffness of the subway station and the pier spacing of the bridge.The reliability of the proposed method is also verified by the finite element method.
作者 崔晗 高彦斌 徐骏 刘朝明 CUI Han;GAO Yanbin;XU Jun;LIU Chaoming(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;Shanghai Jingxie Engineering Consulting Co.,Ltd.,Shanghai 200092,China;Shanghai Shentong Metro Group Co.,Ltd.,Shanghai 200092,China)
出处 《结构工程师》 2024年第3期16-21,共6页 Structural Engineers
关键词 站桥合一 地铁车站 荷载分配 有限元方法 station-bridge co-construction subway station load distribution finite element method
  • 相关文献

参考文献9

二级参考文献44

共引文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部