2000 t风电安装平台故障模式分析设计要点

FMEA Design Requirement of 2000 t Wind Power Installation Platform
下载PDF
导出
摘要 本文基于2000 t风电安装平台电气设计,针对DP2符号的设计要求,阐述FMEA试验的设计要点;结合全船的故障设计意图和实船的电气设计方法,提出设计注意事项,避免在实际试验过程中出现单点故障影响冗余组正常运行,确保FMEA试验结果的准确性,减少因试验结论引起的技术修改。 Based on the design requirements of 2000 t wind turbine installation platform with DP2 symbol,this paper analyzes and expounds the design points of the FMEA test.In combination with the fault design intent of the whole vessel and the electrical design method of real vessel,the design precautions are proposed,in order to avoid the phenomenon of single point failure affecting the normal operation of the redundancy group in the actual test process,ensure the accuracy of the FMEA test results and reduce technical modifications caused by test conclusions.
作者 郑楚忠 梁少辉 杨志刚 江梓瑜 ZHENG Chuzhong;LIANG Shaohui;YANG Zhigang;JIANG Ziyu(CSSC Huangpu Wenchong Shipbuilding Co.,Ltd.,GuangZhou 510715)
出处 《广东造船》 2024年第3期70-72,77,共4页 Guangdong shipbuilding
关键词 设计 试验 故障模式影响和分析 design test FMEA
  • 相关文献

参考文献1

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部