300 m超高塔斜拉桥钢混组合梁整节段施工方案比选研究

CONSTRUCTION SCHEME OF THE WHOLE SECTION OF 300 m ULTRA-HIGH TOWER CABLE-STAYED BRIDGE
下载PDF
导出
摘要 山区跨越深切峡谷斜拉桥钢混组合梁施工方案的选择不同于跨域大江大河及海上斜拉桥施工,因其受地形地貌限制问题较为突出。研究以某特大桥为背景,对比分析了采用缆索吊机整节段施工与悬臂拼装桥面吊机整节段施工钢混组合梁斜拉桥在各方面的优缺点,以期为以后施工类似工程提供一定借鉴作用。 The selection of steel-concrete composite girder construction scheme of cable-stayed bridge across deep canyon in mountainous area is different from that of cable-stayed bridge across big river and sea,because it is limited by topography and landform.Based on the background of a large bridge,this paper compares and analyzes the advantages and disadvantages of the cable-concrete composite girder cable-stayed bridge constructed by cable crane and cantilever deck crane,in order to provide some reference for the construction of similar projects in the future.
作者 慕长斌 Mu Chang-bin
出处 《建筑技术开发》 2024年第7期58-61,共4页 Building Technology Development
关键词 钢混组合梁 斜拉桥 整节段施工 steel-concrete composite beam cable-stayed bridge construction of the whole section
  • 相关文献

参考文献4

二级参考文献37

共引文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部