南昌文体中心项目采用大跨度重型钢结构桁架实现了最大99m的无柱空间。为了阐述大跨度重型钢结构桁架的设计思路,考察设计、施工中各因素的影响,通过理论分析和数值模拟细致地讨论了涉及的关键问题,包括杆件布置、支承条件、关键节点构造、施工过程的影响等。结果表明:腹杆布置形式对弦杆内力的影响较小;重型桁架两支承端的连接处理至关重要,应注意保证弦杆轴力在极限承载状态下的有效传递,并弱化弯矩的影响;整体提升施工方案对结构内力分布影响较大,“后激活”部分杆件的方法可以考虑提升过程中桁架端面的转动效果,更为准确地体现施工过程的影响。
Nanchang Cultural and Sports Center project adopts large⁃span heavy steel structure truss to achieve a maximum column⁃free space of 99m.In order to elaborate the design idea of large⁃span heavy steel structure truss,as well as investigate the influence of various factors in design and construction,the key issues were discussed in detail through theoretical analysis and numerical simulation,including layout of truss members,support conditions,structure of key joints,impact of the construction process,etc.The results show that the layout of the web member has little influence on the internal force of the chord member.Treatments of the two supporting ends of the heavy truss is very important.Attention should be paid to ensuring the effective transmission of the axial force of the chord member in ultimate bearing state and weakening the influence of the bending moment.Integral lifting construction scheme has a great influence on the internal force distribution of the structure.The method of"post⁃activation"can consider the rotation effect of the end face of the truss during the lifting process,and reflect the influence of the construction process more accurately.
作者
李竞远
王喆
郁银泉
牛永锋
胡天兵
LI Jingyuan;WANG Zhe;YU Yinquan;NIU Yongfeng;HU Tianbing(China Institude of Building Standard Design&Research Co.,Ltd.,Beijing 100048,China;Department of Civil Engineering,Tsinghua University,Beijing 100084,China)
出处
《建筑结构》
北大核心
2024年第13期23-29,共7页
Building Structure
基金
国家重点研发计划项目“高效能标准化钢结构体系与应用关键技术”(2022YFC3801900)。
关键词
重型钢结构桁架
大跨
复杂节点
施工过程
整体提升
heavy steel structure truss
large⁃span
complex joint
construction process
integral lifting