摘要 作为电力系统中最广泛使用的设备,对10 kV变配电室进行合理安装与质量管理可极大提高供电质量,延长电力设备使用寿命,确保用电安全。以山东省某高校新校区10 kV变配电室电气安装项目为例,通过阐述该变配电室电气设备的布置要点,从安装前、安装中、安装后3个方面,提出电气安装质量控制措施,以期为同类配电室安装工程提供一定参考。 As the most widely used equipment in the power system,reasonable installation and quality management of the 10kV substation and distribution room can greatly improve the quality of power supply,prolong the service life of power equipment,and ensure electricity safety.Taking the electrical installation project of a 10kV substation in a new campus of a university in Shandong Province as an example,this paper elaborates on the layout points of the electrical equipment in the substation,and proposes quality control measures for electrical installation from three aspects:Before installation,during installation,and after installation,in order to provide certain reference for similar substation installation projects.
作者 张东岳 王大可 许成龙 ZHANG Dongyue;WANG Dake;XU Chenglong(Zhoucun Branch,Zibo Qilin Electric Power Engineering Co.,Ltd.,Zibo,Shandong 255300,China)
出处 《自动化应用》 2024年第12期153-155,158,共4页 Automation Application
关键词 10 kV变配电室 电气安装 电力系统 10 kV substation and distribution room electrical installation power system
  • 相关文献

参考文献6

二级参考文献19

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部