EPC项目中造价争议常见问题及对策建议

Common Problems and Countermeasures for Cost Disputes Caused by EPC Projects
下载PDF
导出
摘要 在EPC项目结算、审计过程中各方对工程变更是否合理、造价能否调整往往存在争议。本文对EPC项目引起造价争议的常见问题进行剖析,包括造价体系不健全、招采行为不规范、合同履约不重视,从造价体系、招采行为、合同履约等方面提出措施建议,以期为EPC项目造价争议解决提供参考。 For EPC model,due to disputes over whether engineering changes are reasonable and cost adjustments are often present in the settlement and audit processes.The paper analyzes problems that causing cost disputes,including incomplete laws and regulations in the pricing system,non-standard operational behavior during the bidding and procurement stage,imprecise content agreement in contract signing,and inadequate performance of contract implementation.Then,proposes measures and suggestions from the aspects of price system,operational behavior,contract requirements,and performance behavior,hopes to provide reference for the resolution of EPC project cost disputes.
作者 葛世龙 韩梦婷 胡正俊 GE Shilong;HAN Mengting;HU Zhengjun(School of Engineering Audit,Nanjing Audit University,Nanjing 211815,China;East China Audit Sub-Center of China Construction Group Audit Department,Jinan 250000,China;Nanjing Jiangning District Audit Bureau Fixed Assets Investment Audit Department,Nanjing 211106,China)
出处 《建筑经济》 2024年第7期39-43,共5页 Construction Economy
基金 江苏省审计厅项目(2021JSSJY007) 江苏省高校哲学社会科学基金项目(2022SJYB0344)
关键词 EPC总承包 工程造价 发包人要求 对策建议 EPC general contracting project cost employer's requirements countermeasures
  • 相关文献

参考文献1

二级参考文献17

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部