摘要
针对新型电力系统不确定性显著增加的问题,提出一种考虑场景时序相关性的输电扩展规划模型。采用场景的时间序列表征不确定性,考虑火电机组时序约束,模拟电力系统未来运行。为更加聚焦规划方案的选择,采用分层目标函数分离投资成本和运行成本。为降低模型的计算复杂性,提出循环优化建模方法来求解模型。将所提模型和非时序规划模型应用于Garver’s6节点系统、IEEE 24节点系统和中国西北38节点系统进行比较,结果表明,所提模型可得出更接近实际运行的规划结果。
Aiming at the problem of significant increase of uncertainty in new type power system,a transmission expansion planning model considering scenario temporal correlation is proposed.The scenario temporal sequence is adopted to represent the uncertainty,and future power system operation is simulated considering the temporal constraints of thermal power units.In order to better focus on the selection of planning scheme,the hierarchical objective function is used to separate the investment cost and operating cost.In order to reduce the model computational complexity,a loop optimization modeling method is proposed to solve the model.The proposed model and non-temporal planning model are applied to Garver’s 6-bus system,IEEE 24-bus system,and Northwest China 38-bus system for comparison,and the results show that the proposed model can obtain more realistic planning results.
作者
董吉哲
王淮冬
鲁宇
曹建设
马英浩
DONG Jizhe;WANG Huaidong;LU Yu;CAO Jianshe;MA Yinghao(School of Electrical and Electronic Engineering,Changchun University of Technology,Changchun 130012,China;State Grid Jilin Electric Power Co.,Ltd.,Changchun 130022,China;School of Electrical Engineering and Automation,Hefei University of Technology,Hefei 230009,China)
出处
《电力自动化设备》
EI
CSCD
北大核心
2024年第7期116-122,共7页
Electric Power Automation Equipment
基金
吉林省重点研发计划项目(20220203162SF)。
关键词
输电扩展规划
场景时序相关性
分层目标
循环优化
非时序规划模型
transmission expansion planning
scenario temporal correlation
hierarchical objective
loop optimization
non-sequential planning model