期刊文献+

3m污水管下穿隧道不断流改迁施工技术

Construction Technology for Continuous Flow and Relocation of a 3m Sewage Pipe Passing Through a Tunnel
下载PDF
导出
摘要 随着现代化城市的不断发展,在针对于城市基础进行建设过程当中,下穿隧道包括地铁等一系列的工程已经变得越来越多,在隧道下穿污水管道目前已经成为了建设工程当中比较常见的一项工程。因此在本篇文章当中也会针对于3m污水管下穿隧道不断流改迁技术进行相应的探究,希望能够更好地推动城市建设过程当中的污水管改迁工程的顺利实施。 With the continuous development of modern cities,in the process of constructing urban infrastructure,a series of projects such as underpass tunnels and subways have become more and more common.Crossing sewage pipes under tunnels has become a common construction project.Therefore,this article will also explore the continuous flow and relocation technology of 3m sewage pipes underpass tunnels,hoping to better promote the smooth implementation of sewage pipe relocation projects in urban construction.
作者 张天池 ZHANG Tianchi(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou,He'nan,450000,China)
出处 《工程建设(维泽科技)》 2024年第8期151-154,共4页 Engineering Construction
关键词 污水管道 下穿隧道 L型路由 污水管改迁 sewage pipeline underpass tunnel L-shaped routing relocation of sewage pipes
  • 相关文献

参考文献4

二级参考文献14

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部