期刊文献+

二河新闸工程安全检测分析及对策探讨

Analysis and countermeasure discussion on the safety inspection of the Erhe New Gate project
下载PDF
导出
摘要 二河新闸是淮河入海水道的第一级枢纽工程,其主要作用是承泄洪泽湖洪水,并与淮阴闸联合运用控制入海水道和分淮入沂两河道流量。为确保工程安全运行,全面掌握工程状况,通过现状调查、安全检测和安全复核计算,依据相关规范对二河新闸工程进行鉴定评价和综合评估。 Erhe New Gate is the first level hub project of the Huaihe River waterway into the sea,its main function is to discharge the flood of Hongze Lake,and with the Huaiyin gate joint use to control the flow of the two waterways of Huaihe River into the sea and into Yi River.In order to ensure the safe operation of the project and fully grasp the project status,the evaluation and comprehensive assessment of the Erhe New Gate project are carried out according to the specifications through the methods of current situation investigation,safety testing and safety review calculation.
作者 胡雪枫 郭赞赞 昌魏 董振宇 HU Xuefeng;GUO Zanzan;CHANG Wei;DONG Zhenyu(General Irrigation Canal Management Office of Jiangsu Province,Huai’an 223001,China)
出处 《江苏水利》 2024年第7期69-72,共4页 Jiangsu Water Resources
关键词 水闸 安全检测 质量评估 water gates security testing quality assessment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部