期刊文献+

海绵城市理念下的雨水系统改造策略研究

Research on Rainwater System Reconstruction Strategies under the Sponge City Concept
下载PDF
导出
摘要 为验证海绵城市设施建设对提高现状雨水系统应对不同重现期降雨能力的作用,在不提高现状雨水系统设计规模的前提下,引入海绵城市设施,利用SWMM模型模拟已建成的设计重现期1 a的现状雨水系统增加海绵城市设施前后1、3、5 a设计重现期条件下雨水系统径流。结果表明,增加海绵设施后,系统满足3a设计重现期条件下雨水排放的要求,对设计重现期为5 a的降雨也有较好地排放能力。 In order to verify the ability of sponge city facilities to improve the ability of the current rainwater system to cope with rainfall in different return periods,introducting of sponge city facilities without increasing the de⁃sign scale of the current rainwater systerm,this paper uses the SWMM model to simulate the runoff of the rain⁃water system under the conditions of 1 year,3 year and 5 year design return periods after the completion of the current rainwater system with a design return period of 1 year and the addition of sponge city facilities.The results show that after adding sponge facilities,the system meets the needs of rainwater discharge under the condition of 3 year design return period,and has better discharge capacity for rainfall with a design return pe⁃riod of 5 years.
作者 任艳琴 王绍华 REN Yanqin;WANG Shaohua(Tianjin City Planning and Design Research Institute,Tianjin 300191,China;Tianjin Municipal Engineering Design&Research Institute Co.Ltd.,Tianjin 300392,China)
出处 《天津建设科技》 2024年第3期54-57,共4页 Tianjin Construction Science and Technology
关键词 海绵城市 雨水系统 设计重现期 sponge city rainwater system design return period
  • 相关文献

参考文献4

二级参考文献58

  • 1赵飞,张书函,陈建刚,孔刚,龚应安.透水铺装雨水入渗收集与径流削减技术研究[J].给水排水,2011,37(S1):254-258. 被引量:55
  • 2水利部珠江水利委员会《珠江志》编纂委员会.珠江志(第1卷)[M].广州:广东科技出版社,1991:169-172.
  • 3STOCKER T F, QIN D, PLATI'NER G K, TIGNOR M, ALLEN S K, BOSCHUNG J, NAUELS A, XIA Y, BEX V, MIDGLEY P M, Working Group I Technical Support Unit[R]//IPCC, 2013 : climate change 2013 :the physical science basis. Stockholm: Contribution of working group I to the fifth assessment report of the intergovernmental panel on climate change, 2013.
  • 4JALAYER F, DE RISI R, DE PAOLA F, GIUGNI M, MANFREDI G, GASPAR1NI P, TOPA M E, YONAS N, YESHITELA K, NEBEBE A, CAVAN G, LINDLEY S, PRINTZ A, RENNER F. Probabilistic GIS- based method for delineation of urban flooding risk hotspots[J]. Natural Hazards, 2014, 73 (2) : 1-27.
  • 5J]ANG X, YUAN H, XUE M, CHEN X, TAN X. Analysis of a heavy rainfall event over Beijing during 21-22 July 2012 based on high resolution model analyses and forecasts[J]. Journal of Meteorological Research, 2014, 28: 199-212.
  • 6RANGER N, HALLEGATFE S, BHA33"ACHARYA S, BACHU M, PRIYA S, DHORE K, RAFIQUE F, MATHUR P, NAVILLE N, HENRIET F, HERWEIjER C, POHIT S, COFEE Morlot J. An assessment of the potential impact of climate change on flood risk in Mmnbai[J]. Climatic Change, 2011, 104 ( 1 ) : 139-167.
  • 7ZHANG Q, SINGH V P, PENG J T, CHEN Y D, LI J. Spatial-temporal changes of precipitation structure across the Pearl River basin, China [J]. Journal of Hydrology, 2012, 40: 113-122.
  • 8ROSSMAN L A. Storm water management model user's manual version 5.0[EB/OL]. [2014-04]. http://www.epa.gov/nrmrl/wswrd/wq/models/sw mm/#Downloads.
  • 9JANG S M Cho. Using SWMM as a Tool for Hydrologic Impact Assessment[J]. Desalination, 2007, 212 (1/3): 344-356.
  • 10DOHERTY J. PEST: Model-Independent Parameter Estimation User Manual[EB/OL]. [2014-04-21]. 5thEdition. http://www.pesthomepage. org/Downloads.php,2010.

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部