摘要 基于对隔水管下部总成不同工况的分析,对其液压控制系统内的续油管剪切闸板、钢丝剪切阀及延时驱动装置等关键元器件进行AMESim建模后分析,并针对不同工况对液压控制系统进行仿真研究。利用AMESim平台进行机械、电器、液压联合仿真,分析研究匹配参数,从而验证液压控制系统配置能完整完成“首次脱离-回接-二次脱离”的工作任务,为隔水管下部总成液压控制系统的工程开发提供了理论指导。 Based on the analysis of different working conditions of the Lower Marine Riser Package(LMRP),building the models and analysis for coiled tubing cutting gate,wireline cutting valve and time-delay drive device on the AMESim platform,then study the Hydraulic System on different working conditions.Using the AMESim platform to carry out joint simulation of machinery,electrical and hydraulic equipment,analysis and matching parameters,then verifying that the hydraulic system configuration can complete the task of“first disengagement-tieback-second disengagement”,providing the oretical guidance for the engineering development of the hydraulic system of the Lower Marine Riser Package.
作者 邓荣 李欢 刘姣利 王德贵 张新刚 DENG Rong;LI Huan;LIU Jiao-li;WANG De-gui;ZHANG Xin-gang(CNPC Baoji Oilfield Machinery Co.,Ltd.,Baoji 721000,China;National Engineering Research Center for Oil and Gas Drilling Equipment Co.,Ltd.,Baoji 721000,China)
出处 《液压气动与密封》 2024年第7期20-27,共8页 Hydraulics Pneumatics & Seals
基金 国家工信部高技术船舶科研项目(CBG2N21-4-2)。
关键词 隔水管下部总成 液压系统 联合仿真 AMESIM Lower Marine Riser Package hydraulic system joint simulation AMESim
  • 相关文献

参考文献9

二级参考文献75

  • 1高德利,王宴滨.海洋深水钻井力学与控制技术若干研究进展[J].石油学报,2019,40(S02):102-115. 被引量:18
  • 2畅元江,陈国明,许亮斌.海洋钻井隔水管固有频率的简化计算[J].中国海上油气(工程),2005,17(5):352-355. 被引量:13
  • 3Robinson E. Drilling fundamentals-DP operations-drilling with riser[C]// Marine Technology Society. Review of DP applications, consequences and cost of failures. Houston: Dynamic Positioning Committee, 1997: 1-6.
  • 4Ge L, Bhalla K, Stahl M. Operation integrity evaluations for deepwater drilling riser system[R]. OMAE 20400, 2010.
  • 5Williams D. Optimization of drilling riser operability envelopes for harsh environments[R]. OTC 20775, 2010.
  • 6Sparke C P. Fundamentals of marine risers mechanics[M]. Tulsa: PennWell Corp, 2007: 253-258.
  • 7International Organization for Standardization. ISO 13624-1-2009 Petroleum and natural gas industries: Drilling and production equipment--Part 1: Design and operation of marine drilling riser equipment[S]. Geneva: International Organization for Standardization, 2009.
  • 8Bai Yong, Bai Qiang. Subsea pipelines and risers[M]. Amsterdam: Elsevier Science Ltd., 2005: 536-548.
  • 9American Petroleum Institute. API RP 16Q-1993 Recommended practice for design selection operation and maintenance of marine drilling riser system[S]. Washington: American Petroleum Institute, 1993.
  • 10Meerae H. Marine Riser Systems and Subsea Blowout Preventors. University of Texas Press, 2003.

共引文献107

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部