期刊文献+

1200 m特高水头钢岔管制造创新与质量控制

Manufacturing Innovation&Quality Control of Steel Bifurcated Pipe under 1200m Extra High Head
下载PDF
导出
摘要 为保证1200 m特高水头钢岔管制造质量与工期,长龙山抽水蓄能电站建设者进行了系列创新,并提出了控制措施,通过考察确定钢岔管整体制造、运输至工地的方案,采用控制钢板下料放样、划线、卷制、组拼、焊接等工序来保证钢岔管外形尺寸及内在质量。水压试验表明:在初次水压试验成功基础上提高第二次试验压力值,进一步减小钢岔管成品焊接残余应力,创下国内钢岔管10 MPa水压试验记录。可为类似工程提供参考。 To ensure the manufacturing quality and construction period of the steel bifurcation pipe under 1200 m extra-high head,the builders of the Changlongshan Pumped Storage Power Station have carried out a series of innovation and control measures.Through investigating and determining the overall manufacturing and transportation plan of the steel bifurcation pipe to the construction site in advance and controlling the processes of steel plate cutting,marking,rolling,assembly and welding,the external dimensions and internal quality of the steel bifurcated pipe are guaranteed.The water pressure test results show that on the basis of the first successful water pressure test,the pressure value of the second test is increased to further reduce the residual stress of the welded steel bifurcation pipe,setting a record of 10 MPa for the water pressure test of steel bifurcation pipe in China.It can provide reference for similar projects.
作者 朱树清 胡铠 易克新 ZHU Shuqing;HU Kai;YI Kexin(Yangtze Three Gorges Technology&Economy Development Co.,Ltd.,Beijing 101199,China;China Yangtze Power Co.,Ltd.,Beijing 100032,China;China Three Gorges Materials&Tendering Management Co.,Ltd.,Chengdu 610042,China)
出处 《西北水电》 2024年第3期48-53,共6页 Northwest Hydropower
关键词 特高水头 钢岔管 制造 创新 质量控制 ultra-high water head steel bifurcated pipe manufacturing innovation QC
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部