摘要
通过对白铜盘管制造装备、生产工艺及工艺条件、辅助设施等5M1E原始状况的调查分析并实施改进措施,达到提升白铜盘管的产品质量、综合成材率和市场占有率、降低生产成本的目的。
Through the investigation and analysis of the 5M1E original condition of copper-nickel coil manufacturing equipment,production process and process conditions,auxiliary facilities,and the implementation of improvement measures,the purpose of improving the product quality,comprehensive yield and market share of copper-nickel coil and reducing the production cost is achieved.
作者
柏昆亚
BAI Kun-ya(Shanghai Hailiang Copper Co.,Ltd.,Shanghai 200000,China)
出处
《世界有色金属》
2024年第9期13-15,共3页
World Nonferrous Metals
关键词
白铜盘管
生产工艺
成材率
制造成本
盘拉
copper-nickel coil
Production process
Yield
Manufacturing cost
Coil pull