景电二期加大向民勤调水的可行性与解决措施分析

Feasibility and Solution Analysis of Increasing Water Transfer to Minqin in the Second Phase of Jingdian Power Station
下载PDF
导出
摘要 景电二期工程主要承担向景电二期灌区、民勤和黄花滩供水任务,近年来,随着民勤经济社会高质量发展,用水需求逐年加大,现有水资源无法满足经济社会快速发展的要求。通过现有跨流域调水通道(景电二期工程)尽快实现加大向民勤调水目的是否具有可行性有待进一步分析论证。 Jingdian Phase II Project mainly undertakes the task of supplying water to Jingdian Phase II Irrigation District,Minqin and Huanghuatan.In recent years,with the high-quality development of Minqin's economy and society,the demand for water has increased year by year,and the existing water resources cannot meet the requirements of rapid economic and social development.Whether it is feasible to increase water transfer to Minqin as soon as possible through the existing inter-basin water transfer channel(Jingdian Phase II Project)needs further analysis and demonstration.
作者 何岩峰 HE Yan-feng(Gansu Jingtaichuan Electric Power Irrigation Water Resource Utilization Center,Baiyin 730900,China)
出处 《价值工程》 2024年第21期29-31,共3页 Value Engineering
基金 2024年甘肃省水利科学试验研究及技术推广项目。
关键词 景电二期 民勤调水 可行性 解决措施 Jingdian Phase II Minqin water transfer feasibility solution measure
  • 相关文献

参考文献3

二级参考文献37

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部