针对河北衡丰发电有限责任公司尿素制氨系统水解器并联运行中出力偏差大的问题,分析了原因,并相应提出了改进方案。
In response to the problem of large output deviation in the parallel operation of the urea to ammonia system hydrolysis reactor at Hebei Hengfeng Power Generation Co.,Ltd.,the reasons were analyzed,and corresponding improvement plans were proposed.
作者
王枫
WANG Feng(Hebei Hengfeng Power Generation Co.,Ltd.,Hengshui 053000,China)
出处
《价值工程》
2024年第21期58-60,共3页
Value Engineering
关键词
电厂尿素制氨系统
水解器
运行控制优化
power plant urea to ammonia system
hydrolyzer
optimization of operation control