期刊文献+

预应力混凝土T梁设计施工一体化技术研究

Research on the Integrated Technology of Design and Construction of Prestressed Concrete T Beam
下载PDF
导出
摘要 本文以内荆河节制闸工程为实践背景,研究了预应力混凝土T梁设计施工一体化技术。通过详细的施工工艺、施工流程、施工效果分析,展示了该技术的优势,为类似工程提供了借鉴。研究表明,这种一体化技术提高了施工效率,增强了结构的承载能力和抗裂性能,同时实现了经济效益和社会效益的双丰收。未来,类似工程应继续优化该技术,加强施工过程的安全和质量控制,注重环境保护。 This paper takes the Ningji River Control Weir project as the practical background and studies the integrated design and construction technology of prestressed concrete T-beams.Through detailed analysis of construction processes,procedures,and effects,the advantages of this technology are demonstrated,providing reference for similar projects.The research shows that this integrated technology enhances construction efficiency,improves the load-bearing capacity and crack resistance of the structure,and achieves a dual harvest of economic and social benefits.In the future,similar projects should continue to optimize this technology,strengthen safety and quality control in the construction process,and pay attention to environmental protection.
作者 荆松 原山山 陈超 JING Song;YUAN Shan-shan;CHEN Chao(CCCC-SHEC Dong Meng Engineering Co.,Ltd.,Xi′an 710119,China)
出处 《价值工程》 2024年第21期97-100,共4页 Value Engineering
关键词 预应力混凝土T梁 设计施工一体化技术 施工效率 经济效益 prestressed concrete T-beams integrated design and construction technology construction efficiency economic benefits
  • 相关文献

参考文献6

二级参考文献30

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部