期刊文献+

1000MW级核电站常规岛厂房疏放水系统设计优化方案研究

Research on design optimization scheme of drainage water system for conventional island of 1000MW nuclear power plant
原文传递
导出
摘要 核电厂疏放水系统是影响机组长期稳定运行的重要组成部分[1]。本文通过分析CAP1000系列三代核电机组项目设置的疏放水系统方案,对1000MW级核电站汽机厂房疏放水系统提出优化方案研究。研究结果显示,优化设计方案满足了核电厂的设计要求,同时本研究结果也可为后续其他核电厂提供参考。 The water drainage system of nuclear power plant is an important part of the long-term stable operation of the unit[1].Through analyzing and studying the water diversion system scheme set up in the CAP1000 series third-generation nuclear power unit project,the optimization scheme of the water diversion system for the turbine building of 1000MW nuclear power plant is proposed.The results show that the optimal design scheme meets the design requirements of nuclear power plants,and the results can also provide reference for other nuclear power plants in the future.
作者 潘敏 PAN Min(Guangdong Electric Power Design and Research Institute Co.,LTD.,China Energy Construction Group,Guangdong 510663,China)
出处 《高科技与产业化》 2024年第6期53-55,共3页 High-Technology & Commercialization
关键词 核电 常规岛 疏放水系统优化 冲洗水回收 良好借鉴 nuclear power,Regular island Drainage system optimization,Rinse water recovery,Good reference
  • 相关文献

参考文献1

二级参考文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部