期刊文献+

竖向后浇带预制加强型钢板式模板免拆施工技术研究

Vertical Pre-cast Reinforced Steel Plate Formwork for Belt Concrete Pouring(BCP)Construction Technology
下载PDF
导出
摘要 文中以某住宅项目地下室为例,探讨了一种新型的竖向后浇带防护技术。该技术采用竖向后浇带预制加强型钢板式模板免拆施工技术,通过焊接连接钢板和方通等材料形成主体框架,并以钢板作为防护板,起到有效防护作用。针对传统方法存在的施工周期长、成本高、质量不稳定等问题,本研究提出的技术具有施工周期短、成本低、施工质量稳定等优势。实践证明,该技术在地下室竖向后浇带防护方面具有良好的应用前景和推广价值。 This study investigates a novel vertical belt concrete pour(BCP)protection technique,using a residential project's basement as a case study.The technique employs a prefabricated reinforced steel plate formwork for vertical BCP protection,welding steel plates and steel channels to form the main frame and using steel plates as protective panels.Addressing issues such as long construction periods,high costs,and unstable quality associated with traditional methods,the proposed technique offers advantages of shorter construction periods,lower costs,and stable construction quality.Practical application demonstrates promising prospects and promotional value for this technique in vertical BCP protection for basements.
作者 潘方贤 Pan Fangxian(Guangxi Daxing Construction Group Co.Ltd.,Nanning,Guangxi 530000)
出处 《江西建材》 2024年第4期232-236,共5页
关键词 地下室 后浇带防护 钢板式模板 施工周期 成本 施工质量 Basement Belt Concrete Pour(BCP)Protection Steel plate formwork Construction period Cost Construction quality
  • 相关文献

参考文献6

二级参考文献18

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部