期刊文献+

地铁车站深基坑开挖变形智能多步预测方法

Multi-Step Prediction of Excavation Deformation of Subway Station Based on Intelligent Algorithm
下载PDF
导出
摘要 为更好预测深基坑开挖期间地下连续墙的侧向位移变形,基于长短期记忆神经网络(LSTM)智能算法理论构建了LSTM多步预测模型.首先对多步预测模型的多输出策略进行论述,其次详细介绍了LSTM多步预测模型的构建方法,并对模型输入集空间维度和时间维度两项超参数进行探究,以提高模型的预测准确度.最后依托某富水砂土深基坑工程实例,分析了模型预测值与实际监测值的差异.3个典型监测点的数据分析结果表明LSTM多步预测模型具有较强的泛化能力,相关算法对深基坑开挖变形预测方法的改进优化具有参考价值. To better predict the lateral displacements of diaphragm walls during deep excavation,a long short-term memory(LSTM)multi-step prediction model is developed in this paper based on the LSTM algorithm.First,the multi-output strategy of multi-step prediction model is discussed.Then,the construction method of the LSTM multi-step prediction model is introduced in detail,and the two hyperparameters,i.e.,the space and time dimensions of the model input set,are explored to improve the prediction accuracy of the model.Finally,the errors between the predicted values and the field monitoring data are analyzed based on an excavation project buried in water-rich sandy strata.The analysis results of three typical monitoring points indicate that the LSTM prediction model is characterized by solid generalization ability,and the relevant algorithm is practically helpful for improving and optimizing deformation prediction methods of deep excavation.
作者 刘俊城 谭勇 张生杰 LIU Juncheng;TAN Yong;ZHANG Shengjie(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China)
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2024年第7期1108-1117,共10页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金(42177179)资助项目。
关键词 基坑工程 开挖变形预测 长短期记忆神经网络智能算法 多步预测模型 excavation deformation prediction long short-term memory(LSTM)intelligent algorithm multi-step prediction model
  • 相关文献

参考文献2

二级参考文献19

  • 1木林隆,黄茂松,吴世明.基于反分析法的基坑开挖引起的土体位移分析[J].岩土工程学报,2012,34(S1):60-64. 被引量:19
  • 2Terzaghi K. Theoretical soil mechanies [M]. New York: John Wiley & Sons, 1943.
  • 3Hsieh P G, Ou C Y. Shape of ground surface settlement profiles caused by excavation [J]. Canadian Geoteclmical Journal, 1998, 35(6): 1004-1017.
  • 4Ou C Y, Liao J T, Lin H D. Performance of diaphragm wall constructed using top-down method[J]. Journal of Geotechnical & Geoenvironmental Engineering, 1998, 124(9): 798-808.
  • 5Liu G B, Ng C W W, Wang Z W. Observed performance of a deep multistrutted excavation in Shanghai soft clays[J]. Journal of Geotechnical & Geoenvironmental Engineering, 2005, 131(8): 1004-1013.
  • 6Xu Z H, Wang W D, Wang J H, et al. Performance of deep excavated retaining wall in Shanghai soft deposit[J]. Lowland Technology International, 2005, 7(2) : 31-43.
  • 7Wang Z W, Ng C W W, Liu G B. Characteristics of wall deflections and ground surface settlements in Shanghai[J]. Canadian Geotechnical Journal, 2005, 42(5) : 1243-1254.
  • 8Ou C Y, Hsieh P G, Chiou D C. Characteristics of ground surface settlement during excavation[J]. Canadian Geotechnical Journal, 1993, 30(5) : 798-808.
  • 9Mana A I, Clough G W. Prediction of movements for braced cuts in clay[J]. Journal of the Geotechnical Engineering Division, 1981, 107(6): 759-777.
  • 10SZ-08-2000.上海地铁基坑工程施工规程[S].[S].上海市市政工程管理局,..

共引文献83

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部