摘要
文章探讨了在淤泥软土区进行障碍桩拔除时对周边环境的影响。在此类地区,拔桩作业可能对附近的结构和土体产生显著的影响。为确保施工安全和效率,提出了一系列预防措施和建议,特别是针对管线的保护和监测。在软土区进行拔桩时,应特别关注管线的报警阈值,增强电力管廊的基础加固,并对临近在建的深基坑降水情况进行持续监控。为确保监测数据的准确性和真实性,建议直接在监测点进行监测。本研究的结论对于软土区的工程施工具有重要的参考价值,有助于提高施工安全性和效率。
This paper discusses the impact of the obstacle pile removal on the surrounding environment in the silt soft soil area.In such areas,pile-pulling operations may have significant effects on nearby structures and soil bodies.In order to ensure the construction safety and efficiency,this paper puts forward a series of preventive measures and suggestions,especially for the protection and monitoring of pipelines.When extracting piles in the soft soil area,special attention should be paid to the alarm threshold of the pipeline,the foundation reinforcement of the power pipe gallery should be enhanced,and the precipitation of the adjacent deep foundation pit under construction should be continuously monitored.In order to ensure the accuracy and authenticity of the monitoring data,it is recommended to monitor directly at the monitoring points.The conclusion of this study has an important reference value for the engineering construction of soft soil area,and helps to improve the construction safety and efficiency.
作者
胥明芳
XU Mingfang(Jiangsu Jianke Engineering Consulting Co.,Ltd,Nanjing Jiangsu 210000 China)
出处
《江苏建筑》
2024年第3期105-109,共5页
Jiangsu Construction
关键词
淤泥软土区
障碍桩拔除
环境影响
silt and soft soil area
obstacle pile removal
environmental impact