摘要
本文深入探讨了轨道交通地铁车站安装工程招标清单、限价的编制方法及实践探索。在招标清单编制中探讨了工程量的计量和汇总分析;在最高投标限价编制中探讨了按定额组价的方法和人材机单价的确定,以及造价指标的汇总分析,并对最高投标限价进行汇总调整,确保车站安装工程的造价始终处于受控状态;为轨道交通领域的造价指标提供了宝贵的参考依据,并积累了丰富的基础数据。
This paper deeply discusses the compilation methods and practical exploration of bidding list and price limit for rail transit subway station installation projects.In the preparation of the bidding list,the engineering quantity measurement and summary analysis are discussed;In the preparation of the maximum bid price limit,the method of composite price as per quota and the determination of unit price of manpower,material and machine,as well as the summary analysis of the cost index are discussed,and the summary adjustment of the maximum bid price limit is carried out to ensure that the cost of the station installation project is always under control,which provides a valuable reference for the cost index in the field of rail transit,and accumulates a wealth of basic data.
作者
何军民
He Jun-min(Shanghai Zhenghong Construction Engineering Consulting Co.,Ltd.,Shanghai 200000,China)
出处
《建筑与装饰》
2024年第14期133-135,共3页
Construction & Decoration
关键词
轨道交通
车站安装工程
招标清单
最高投标限价
rail transit
station installation project
bidding list
maximum bid price limit