摘要 通过创建二维、三维有限元模型,分析狮子洋通道工程2号隧道基坑开挖对广州地铁18号线风井和区间的影响。验证基坑围护结构设计的合理性,分析二维模型及三维模型的差异,研究了既有结构位移同基坑开挖深度、地铁结构类型之间的关系。研究可为邻近基坑的地铁结构分析提供参考。 The influence of foundation pit excavation of 2#tunnel of the Shiziyang Link Project on air shaft and section of Guangzhou Metro Line No.18 is analyzed by creating 2D and 3D finite element model.The rationality of the design of foundation pit retaining structure is verified,the difference between 2D model and 3D model is analyzed,and the relationship between the displacement of existing structure,the excavation depth of foundation pit and the type of subway structure are studied.The research can provide reference for the analysis of subway structure adjacent to foundation pit.
作者 仝瑞金 蒋茂林 TONG Rui-jin;JIANG Mao-lin(Guangzhou Nansha Communication Investment Group Co.Ltd.,Guangzhou 511455,China;CCCC Second Highway Consultants Co.Ltd.,Wuhan 430056,China)
出处 《公路》 北大核心 2024年第7期204-209,共6页 Highway
关键词 狮子洋通道 既有地铁 邻近基坑 基坑围护结构 有限元 位移 Shiziyang Link Project existing subway adjacent foundation pit retaining structure of foundation finiteelement displacement
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部