摘要
阐述电力系统中高压电气试验的步骤,针对高压电气试验中存在的设备老化、试验过程耗时、数据处理困难、试验结果不准确的问题,提出改进策略,包括更新试验设备、简化试验流程、提升操作人员技术水平、建立质量监管体系。
This paper describes the steps of high-voltage electrical testing in the power system.It proposes improvement strategies to address the problems of equipment aging,time-consuming testing process,difficult data processing,and inaccurate test results in high-voltage electrical testing,including updating testing equipment,simplifying testing processes,improving the technical level of operators,and establishing a quality supervision system.
作者
王俐
WANG Li(Gansu Vocational and Technical College of Mechanical and Electrical Engineering,Gansu 741000,China)
出处
《集成电路应用》
2024年第6期99-101,共3页
Application of IC
关键词
高压电气试验
数据处理
试验流程优化
high voltage electrical testing
data processing
optimization of testing process