摘要 核电厂辐射源项受堆型、环路数量、运行周期、机组运行时间、一回路设备材质、化学控制工艺、净化单元能力、燃料状态等诸多因素影响,不同堆型及同一堆型不同机组均有各自的源项特性。本文从放射性系统滤芯运行优化、合适窗口运行临停净化、标准化大修热点测量及冲洗、化学去污、阀腔吸尘等方面介绍我国某核电厂商业运行以来在沉积源项的控制与降低方面实施的多项管理优化措施。 Radiation source term of nuclear power plant is affected by many factors,such as reactor type,number of loops,operation cycle,unit operation time,material of primary circuit equipment,chemical control process,purification unit capacity,and fuel state.The source term from different reactor type and different units of the same reactor type may have their own characteristics,which makes source term control a more complicated work.
作者 刘文元 宋岩 郭飞 张泽群 蒲立星 LIU Wenyuan;SONG Yan;GUO Fei;ZHANG Zequn;PU Lixing(Fujian Ningde Nuclear Power Co.Ltd.,Fujian Fuding 355200)
出处 《辐射防护通讯》 2024年第3期21-25,共5页 Radiation Protection Bulletin
关键词 核电厂 辐射源项 控制 优化 nuclear power plant source term control optimization
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部