期刊文献+

大跨钢桁架桥梁全预制装配式施工方法分析

Analysis on Fully-prefabricated Assembly Construction Method for Large-span Steel Truss Bridge
下载PDF
导出
摘要 传统的桥梁施工工艺存在施工效率低、施工环境具有局限性等多种实际问题,这些问题在当前的社会环境下日益凸显。全预制装配式施工技术的应用有效解决了上述问题,在保证桥梁工程安全质量的同时,显著提高了施工效率。因此,文章针对大跨钢桁架桥梁全预制装配式施工方法展开思考,探究全预制装配式桥梁施工技术在实际工程中的应用方案,旨在为桥梁工程的施工建设提供更科学、有效的技术支持。 The traditional bridge construction technology has many practical problems,such as low construction efficiency and limited construction environment.These problems are increasingly prominent in the current social environment.The application of fully-prefabricated assembly construction technology effectively solves the above problems,and significantly improves the construction efficiency while ensuring the safety and quality of bridge engineering.Therefore,this paper considers the fully-prefabricated assembly construction method for large-span steel truss bridge,and explores the application scheme of fully-prefabricated assembly bridge construction technology in practical engineering,aiming to provide more scientific and effective technical support for the construction of bridge engineering.
作者 王小平 WANG Xiaoping(Guizhou Transportation Planning Survey&Design Academe Co.,Ltd.,Guiyang 550000,Guizhou,China)
出处 《工程技术研究》 2024年第9期31-33,共3页 Engineering and Technological Research
关键词 预制加工 灌浆套筒 吊装施工 prefabrication processing grout sleeve hoisting construction
  • 相关文献

参考文献5

二级参考文献34

共引文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部