摘要
近年来,我国科学技术水平不断提升。在污水处理领域,现代污水处理站结合了多层生物滤池工艺(以下简称MLBF工艺)等诸多技术类型,污水处理效果得到明显优化。与此同时,污水处理站的施工难度也明显加大,对其进行研究具有一定的现实意义。文章以鄂州市梁子湖区污水处理站施工建设为主要研究对象,对其施工部署与准备、施工技术应用策略、质量保证措施等内容进行综合研究,希望为现代污水处理站施工建设质量提升提供一定的理论支持。
In recent years,the level of science and technology in China has been continuously improved.In the field of sewage treatment,modern sewage treatment stations have combined many technical types such as multi-layer biological filter process(hereinafter referred to as MLBF process),and their sewage treatment effects have been significantly optimized.At the same time,the construction difficulty of the sewage treatment station has also increased significantly,and the research on it has certain practical significance.Taking the construction of sewage treatment station in Liangzihu District of Ezhou City as the main research object,this paper makes a comprehensive study on its construction deployment and preparation,construction technology application strategies,quality assurance measures and so on,hoping to provide some theoretical support for the construction quality improvement of modern sewage treatment station.
作者
刘余杰
LIU Yujie(CCCC Second Harbor Engineering Co.,Ltd.,Wuhan 430000,Hubei,China)
出处
《工程技术研究》
2024年第9期96-98,共3页
Engineering and Technological Research
关键词
污水处理
格栅井施工
多层生物滤池工艺
MLBF工艺
sewage treatment
grille well construction
multi-layer biologicalfilter process
MLBF process