摘要
新建隧道近距离下穿既有地铁线路时,采取合适的沉降控制措施尤为重要,文章以济南地铁某新建盾构隧道下穿既有地铁线路工程为背景,通过对施工过程的数值模拟,并结合监测数据和盾构施工参数,探讨新建盾构隧道近距离下穿既有地下线路的施工注意事项,验证隧道沉降控制措施的可行性。
It is particularly important to take appropriate settlement control measures when a newly-built tunnel passes underneath the existing subway line at a close distance.Based on the project of a newly-built shield tunnel passing underneath the existing subway line in Jinan Metro,this paper discusses the construction precautions of the newly-built shield tunnel passing underneath the existing subway line at a close distance by numerical simulation of the construction process and combined with monitoring data and shield construction parameters,and verifies the feasibility of tunnel settlement control measures.
作者
陈奎
赵晓东
CHEN Kui;ZHAO Xiaodong(Jinan Rail Transit Group Construction Investment Co.,Ltd.,Jinan 250014,Shandong,China)
出处
《工程技术研究》
2024年第10期1-3,共3页
Engineering and Technological Research
关键词
盾构隧道
既有地铁线
盾构施工
变形控制
自动化监测
shield tunnel
existing subway line
shield construction
deformation control
automatic monitoring