文章以S326浏阳市澄潭江至宁乡县沙田公路工程为主要研究对象,对步履式钢槽梁顶推施工安全管理要点及措施进行研究。研究表明,通过施工流程管理,采取质量及安全保障措施,可有效降低步履式钢槽梁顶推施工过程中的安全风险,提高施工质量和效率。
This paper takes the S326 Chengtan River in Liuyang City to Shatian in Ningxiang County highway engineering as the main research object,and studies the safety management points and measures of the incremental launching construction of walking steel trough beams.The research shows that through the construction process management and adopting quality and safety guarantee measures,the safety risks in the incremental launching construction process of the walking steel trough beam can be effectively reduced and the construction quality and efficiency can be improved.