期刊文献+

峡江水利枢纽大坝安全监测成果分析

Analysis of Dam Safety Monitoring Results of Xiajiang Hydro-junction
下载PDF
导出
摘要 介绍峡江水利枢纽建设管理期的监测设施布置情况,并对2018年以来的坝体部分安全监测数据进行分析评价,发现部分监测设备的历史测值浮动较大。主要是因为枢纽监测设备没有及时维护造成的。对大坝的各监测物理量进行监测成果分析,得出峡江水利枢纽大部分监测设施总体运行正常,自动化系统工作总体正常。 The layout of monitoring facilities during the construction and management period of Xiajiang Water Conservancy Project is introduced,and the safety monitoring data of some dam bodies since 2018 are analyzed and evaluated.It is found that the historical values of some monitoring equipment fluctuate greatly.This is mainly due to the lack of timely maintenance of hub monitoring equipment.The monitoring results of each monitoring physical quantity of the dam are analyzed,and it is concluded that most of the monitoring facilities of Xiajiang Water Conservancy Project are in normal operation,and the automation system works normally.
作者 张霁云 Zhang Jiyun(Jiangxi Provincial Xiajiang Hydro-junction Project Adminstration,Nanchang 330095,Jiangxi)
出处 《陕西水利》 2024年第8期149-152,共4页 Shaanxi Water Resources
关键词 峡江水利枢纽工程 自动化系统 安全监测 Xiajiang Water Conservancy Project automation system safety monitoring
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部