摘要
预制管桩在施工过程中,极易引发挤土效应,大面积静压群桩尤为明显。论文依托昆明市某项目大面积群桩施工,通过设置AB两组条件一致试验区,探索更适用于大面积群桩施工过程中挤土效应控制措施。通过对A组试验数据进行分析,改进B组施工控制措施,发现针对大面积静压群桩,适当加大引孔深度、设置深层泄水井对于挤土效应控制更为有效。
In the construction process of precast pipe pile,it is very easy to cause soil squeezing effect,especially large-area static pressure pile group.Relying on the large-area pile group construction of a project in Kunming,the control measures of soil squeezing effect in the process of large-area pile group construction are explored by setting up two groups of A and B test areas with consistent conditions.Through the analysis of group,a test data and the improvement of group B construction control measures,it is found that for large-area static pressure pile groups,appropriately increasing the depth of pilot holes and setting deep drainage wells are more effective for the control of soil compaction effect.
作者
岳忠翔
苏志华
杨春荣
张小敏
王心
YUE Zhongxiang;SU Zhihua;YANG Chunrong;ZHANG Xiaomin;WANG Xin(China Construction First Engineering Group North China Construction Co.,Ltd.,Tianjin 300450,China)
出处
《工程质量》
2024年第7期85-88,93,共5页
Construction Quality
关键词
预制管桩
静压群桩
挤土效应
施工控制措施
precast pipe pile
static pressure pile group
soil squeezing effect
construction control measures