摘要
对三福高速公路龙慈隧道强风化弱质围岩浅埋地段新奥法施工初期喷锚支护的施工过程进行了较为详细的叙述。
The thesis give a minure description of the process of shotconcrete and support construction in Longci Tunnel of San(ming)-Fu(zhou)Expressway.Longci Tunnel have characters as following;serious weathering.weak country rock shallow-bury location,Neo-Austria merthod construction.
出处
《福建建筑》
2002年第B10期59-60,共2页
Fujian Architecture & Construction