摘要
网架重构阶段是电力系统恢复的重要阶段,需要使电网各个节点更快更优地满足约束条件。文章基于PSS/E给出的OPF优化方案,将无功优化措施对电网的影响进行计算,提出就近调整原则,最后通过山东电网的算例验证了该方案的可行性。
The grid reconstruction stage is an important stage for the restoration of the power system,and it is necessary to make each node of the power grid meet the constraint conditions faster and better.This article is based on the OPF optimization scheme provided by PSS/E,calculates the impact of reactive power optimization measures on the power grid,proposes the principle of nearby adjustment,andfinally verifies the feasibility of this scheme through a case study of Shandong power grid.
作者
孔亚伟
薛凌峰
尹曙光
KONG Yawei;XUE Lingfeng;YIN Shuguang
出处
《今日自动化》
2024年第5期40-42,共3页
Automation Today
关键词
电力系统恢复
PSS/E仿真
网架重构
无功优化
就近调整
power system recovery
PSS/E simulation
grid reconstruction
reactive power optimization
adjust nearby