摘要 作为火电厂的核心装备,汽轮机的正确安装对火电厂运行效益有着直接影响。火电厂汽轮机安装过程涉及众多复杂的施工工艺和高水准的技术要求,须不断强化其安装过程中的施工质量管控,以保证设备的安装品质。实际工作中,火电厂汽轮机的安装存在诸多问题,可能导致严重的安全隐患甚至对机组高效运行带来影响。文章分析了火电厂汽轮机的安装施工工艺及其关键点,旨在为相关领域提供参考。 As the core equipment of thermal power plant,the correct installation of steam turbine has a direct impact on the operation efficiency of thermal power plant.The installation process of steam turbine in thermal power plant involves many complex construction techniques and high level technical requirements,so it is necessary to strengthen the construction quality control in the installation process to ensure the installation quality of equipment.In practice,there are many problems in the installation of steam turbines in thermal power plants,which may lead to serious safety hazards and even affect the efficient operation of units.This paper analyzes the installation and construction technology of steam turbine in thermal power plant and its key points in order to provide reference for relatedfields.
作者 王栋 WANG Dong
出处 《今日自动化》 2024年第5期70-72,共3页 Automation Today
关键词 火电厂 汽轮机 本体安装 施工工艺 thermal power plants steam turbine main body installation construction technology
  • 相关文献

参考文献4

二级参考文献17

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部