摘要
超前用应力区围岩控制是确保综采工作面稳定的关键,做好该项工作意义重大。本文在阐述围岩变形与破坏常见形式基础上,对工程实例,对综采工作面超前应力区围岩控制相关内容进行了探究,以期对相关工作人员有所帮助。
Advanced use of stress zone surrounding rock control is the key to ensuring the stability of fully mechanized mining face,and it is of great significance to do this work well.On the basis of explaining the common forms of deformation and failure of surrounding rock,this article explores the relevant content of surrounding rock control in the advanced stress zone of the fully mechanized mining face through engineering examples,in order to provide assistance to relevant personnel.
作者
李伟
Li Wei(Shanxi Fenxi Ruitai Zhengzhong Coal Industry Co.,Ltd.,Lingshi Shanxi031300,China)
出处
《山西化工》
CAS
2024年第7期212-214,共3页
Shanxi Chemical Industry
关键词
综采工作面
块体滑移
围岩控制
锚索吊棚
fully mechanized mining face
block slip
surrounding rock control
anchor cable hanging shed