摘要
本文重点研究机房精细化模块化组合建设的管控策略,从机房级、机柜级、设备级三个层次对其展开分析,全面覆盖机房建设的各个环节,总结了在实践过程中的管控难点,以确保机房建设的系统性和完整性。为了提高机房的建设质量和管理水平,以目前常见的建设问题为基础,提出了提高资金进度与工程进度配备度、提高订单与实际工程量配备度、提高物资出库与实际工程进度配备度、提高移交与实际工程进度配备度、制定隐蔽工程安全与质检长效机制等具体的应对措施,有利于控制资金短缺、物质挤压等问题,提高其整体工作效率,能够为机房建设的良性发展提供有效参考。
This article focuses on the control strategies for thefine and modular combination construction of computer rooms.It analyzes them from three levels:computer room level,cabinet level,and equipment level,comprehensively covering all aspects of computer room construction.It summarizes the control difficulties in the practical process to ensure the systematic and complete construction of computer rooms.In order to improve the construction quality and management level of the computer room,based on the current common construction problems,specific response measures have been proposed,such as improving the allocation of funds and engineering progress,increasing the allocation of orders and actual engineering quantity,increasing the allocation of material outbound and actual engineering progress,increasing the allocation of transfer and actual engineering progress,and formulating a long-term mechanism for hidden engineering safety and quality inspection.These measures are conducive to controlling problems such as fund shortage and material squeezing,improving overall work efficiency,and providing effective reference for the healthy development of computer room construction.
作者
陈益鑫
CHEN Yixin(Fujian Digital Fujian Cloud Computing Operation Co.,Ltd.)
出处
《中国建设信息化》
2024年第15期52-55,共4页
Informatization of China Construction
关键词
机房
精细化模块化组合建设
管控策略
Computer Room
Fine Tuned Modular Combination Construction
Control Strategy