摘要
介绍了环北部湾广西水资源配置工程的基本情况,论述了大型线性水利工程建设征地工作的特点。分析了环北部湾广西水资源配置工程在当前的建设征地工作中遇到的主要问题,并提出相应的措施和建议。
An introduction was made on the basic information of Guangxi Water Resources Allocation Project around Beibu Gulf,based on which the author demonstrated the features of construction land acquisition for large-scale linear water conservancy project,analyzed the main problems encountered during the land acquisition for Guangxi Water Resources Allocation Project around Beibu Gulf,and put forward corresponding measures and suggestions.