摘要
介绍了生产建设项目水土保持方案管理办法出台的背景。在梳理相关水土保持方案编制要求的基础上,分析环北部湾广西水资源配置工程水土保持方案弃渣场设计的具体内容,提出减少工程弃渣及综合利用、弃渣场选址与防护等方案。
An introduction was made on the background of implementing the management measures for soil and water conservation plans of production and construction projects.On the basis of sorting out the requirements for the preparation of relevant soil and water conservation plans,the author analyzed the specific design contents of the soil and water conservation plan and waste disposal site for Guangxi Water Resources Allocation Project around Beibu Gulf,proposed the plans of reducing waste,comprehensive utilization,waste disposal site selection and protection etc.
作者
黄傲雪
HUANG Ao-xue(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处
《广西水利水电》
2024年第4期139-141,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
弃渣场
选址
防护设计
弃渣减量
综合利用
环北部湾广西水资源配置工程
waste disposal site
site selection
protection design
reduction of waste
comprehensive utilization
Guangxi Water Resources Allocation Project arourd Beibu Gulf