摘要 为了在考虑资源价格变动的情况下,对已根据属性分类后的资源进行资源均衡,本研究基于一电力工程项目,构建在消耗性资源成本约束下的非消耗性资源均衡优化整数线性规划模型,并用所建模型对选取的工程项目进行资源均衡优化,最后用优化后的资源峰值在该工程项目的BIM4D模型中进行受限分析。研究结果表明,该整数线性规划模型对降低资源成本和资源用量峰值具有较好的效果,且满足施工过程中的空间受限。 In order to balance resources that have been classified according to attributes while considering changes in resource prices,this study is based on an electric power project,establishes a non-depletable resource balance optimization integer linear programming model under the constraint of consumable resource costs.The constructed model is then applied to optimize resource balance for selected engineering projects.Finally,the optimized resource peaks are analyzed within the BIM4D model of the project under spatial constraints.The research results indicate that the integer linear programming model effectively reduces resource costs and peak resource usage,while meeting spatial constraints during the construction process.
作者 曾文龙 彭飞 冯焕 李隽恒 ZENG Wenlong;PENG Fei;FENG Huan;LI Junheng(Southern Power Grid Energy Development Research Institute Co.,Ltd,Guangzhou 510000,China;School of Civil and Transportation Engineering,Guangdong University of Technology,Guangzhou 510000,China)
出处 《建筑经济》 2024年第S01期442-447,共6页 Construction Economy
关键词 资源均衡 分类优化 整数线性规划 受限分析 resource balancing categorized optimization integer linear programming constrained analysis
  • 相关文献

参考文献7

二级参考文献41

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部