本文通过实际案例计算,采用TBM法施工,对整个抽水蓄能投资的影响情况进行对比分析,从全寿命期分析TBM整体效益,综合考虑固定资产投资额增加,工期缩短后对建设期贷款利息的影响,提前发电后对运营期还本付息额的影响情况。以样本工程的投资数据为基础,提出计算模型。
This paper compares and analyzes the impact of the entire pumped storage investment through actual case calculation and TBM method construction,analyzes the overall benefit of TBM from the whole life cycle,comprehensively considers the impact of increased fixed assets investment,shortened construction period on loan interest during the construction period,and the impact of early power generation on the repayment of principal and interest during the operation period.Based on the investment data of the sample project,propose a computational model.
作者
佟德宇
张予燮
翟海燕
TONG Deyu;ZHANG Yuxie;ZHAI Haiyan(Pumped-Storage Technological&Economic Research Institute,State Grid Xinyuan Co.,Ltd,Beijing 100053,China)
出处
《建筑经济》
2024年第S01期586-590,共5页
Construction Economy
基金
国家电网有限公司总部管理科技项目资助“能源绿色低碳转型体制下抽水蓄能投资计价体系研究”(1400-202343349A-1-1-ZN)。
关键词
TBM
全寿命期
总工期
固定资产投资额
建设期贷款利息
TBM
full life cycle
total construction period
fixed assets investment
loan interest during construction period