摘要
地铁车站是地铁建设中的关键一环,土建施工技术与进度管理直接决定车站建设的效果。本文主要介绍了明挖法、浅埋暗挖法和盖挖法三种地铁车站土建施工技术,并阐述了地铁车站土建施工进度管理方法与保障措施。做好进度规划、提升专业人员的综合素质、加强材料管理、落实施工资金与施工风险控制工作,能够保证地铁车站施工的顺利进行。
Subway station is a very key link in subway construction,and civil construction technology and schedule management directly determine the effect of station construction.This paper mainly introduces the open excavation method,shallow buried excavation method and cover excavation method of subway station,and expounds the subway station civil construction progress management method and safeguard measures,and improve the comprehensive quality of professionals,strengthen the material management and construction risk control work,can ensure the smooth progress of the subway station construction.