期刊文献+

崩落法转充填法中存窿矿石回收方法研究与实践

Research and Practice on Recovery Method of Deposit Ore in Caving Method to Filling Method
下载PDF
导出
摘要 龙桥铁矿无底柱分段崩落法转充填法过程中,原采场存在大量的存窿矿石资源,主要包括覆盖矿石层和下盘三角矿柱。为安全有效地回收该部分资源,分析采空区及存窿矿石分布状况及技术条件,确定了合理的回收原则,提出了分区回收方案。存窿矿石回收全过程在基于采空区稳定性及监测监控下进行,并顺利实施,充分解决了崩落法转充填采矿法所遗留的资源损失问题,延长矿山服务年限,同时又能对采空区进行安全处理。 In the process of non-pillar sublevel caving method in Longqiao Iron Mine,there are a large number of ore resources in the original stope,which mainly include overburden layer and footer trian-gle pillar.In order to recover this part of resources safely and effectively,the reasonable recovery principle is determined by analyzing the distribution and technical conditions of the ore in the goaf and the hole,and the recovery plan is put forward.The whole process of mine ore recovery is carried out based on the stability and monitoring of the goaf,and is implemented smoothly,which fully solves the problem of resource loss left by the caving method to fill mining method,extends the mine service life,and can safely deal with the goaf.
作者 喻六平 林景尚 和学衡 YU Liuping;LIN Jingshang;HE Xueheng(Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.;Huawei National Engineering Re-search Center for Efficient Recycling of Metallic Mineral Resources Co.,Ltd.;State Key Laboratory of Safety and Health for Metal Mines;Anhui Lujiang Longqiao Mining Co.,Ltd.)
出处 《现代矿业》 CAS 2024年第7期109-112,共4页 Modern Mining
关键词 地下矿山 无底柱分段崩落法 充填法 存窿矿石回收 underground mine non-pillar sublevel caving method filling method deposit ore recovery
  • 相关文献

参考文献3

二级参考文献21

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部