摘要 甘肃省某中型水库在多年的运行过程中,至2021年水库已经淤积了985.9×104m3,库容损失了32%左右,入库沙量近50×104t,严重的制约了该水库工程经济效益的发挥。文章在分析清淤工程建设必要性基础上,从工程选址、淤积处理方式、工程总布置、总体施工方案等方面进行研究,提出了水库清淤的工程方案,为水库清淤工程设计施工提供技术参考和实践经验。 During the operation of a medium-sized reservoir in Gansu Province for many years,by 2021,the reservoir had accumulated 985.9×10^(4)m^(3) of sediment,resulting in a loss of about 32%of storage capacity and a sediment inflow of nearly 50×10^(4)t,severely restricting the economic benefits of the reservoir project.On the basis of analyzing the necessity of dredging engineering construction,this paper explores from the aspects of project site selection,sedimentation treatment methods,overall project layout,and overall construction plan.It proposes an engineering plan for reservoir dredging,providing technical and practical experience for the design and construction of reservoir dredging projects.
作者 刘万东 LIU Wandong(Dayu Irrigation Group Co.,Ltd.,Lanzhou 730000,China)
出处 《云南水力发电》 2024年第8期185-187,共3页 Yunnan Water Power
基金 国家自然科学基金项目(51909104)。
关键词 中型水库 必要性 清淤范围 清淤方式 总体方案 medium sized reservoirs necessity scope of dredging dredging method overall plan
  • 相关文献

参考文献7

二级参考文献27

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部