摘要
结合温凉河特大桥第六联现浇预应力箱梁的特点,介绍了本项目现浇箱梁支架方案的选取及详细施工方法,通过不同的施工技术措施,提升施工效率,降低施工成本,缩短施工时间。
Based on the characteristics of the sixth cast-in-place prestressed box girder of Wenlianghete Bridge,this paper introduces the selection of the support scheme for the cast-in-place box girder and the detailed construction method.Through different construction technical measures,we aim to improve the construction efficiency,reduce the construction cost,and shorten the construction time.
作者
朱璐
张浩岩
ZHU Lu;ZHANG Hao-yan(Ji′nan Kingyue Highway Engineering Company Limited,Ji′nan 250000,China)
出处
《价值工程》
2024年第24期40-42,共3页
Value Engineering
关键词
箱梁
支架
施工
box girder
support
construction