期刊文献+

某矿业项目水土保持措施设计

Design of Soil and Water Conservation Measures for a Mining Project
原文传递
导出
摘要 某矿业项目建设水土保持措施设计因地制宜,因害设防,实行工程、植物、临时防治措施相结合,布设科学、合理、综合的防治体系,为开发建设单位搞好水土保持提供技术支撑。文章根据项目区水土流失基本情况,详细阐述了工业场地1^(#)~5^(#)矿区采取的工程措施、植物措施及临时措施。特别是通过对排水沟过流能力的精确计算,确定排水沟断面类型、断面尺寸、衬砌厚度等具体量值,对造成的水土流失可以得到有效治理,各项目区防治措施指标均能达到预定目标。 The design of water and soil conservation measures for the construction of a mining project is adapted to local conditions,with hazard prevention measures implemented.A combination of engineering,vegetation,and temporary prevention and control measures is implemented,and a scientific,reasonable and comprehensive prevention and control system is set up to provide technical support for development and construction units to do a good job in water and soil conservation.According to the basic situation of soil erosion in the project area,this paper elaborates the engineering measures,plant measures and temporary measures taken in the 1^(#)~5^(#)mining area of the industrial site.In particular,through the accurate calculation of the overflow capacity of the drainage ditch,the specific quantity values such as the section type,section size and lining thickness of the drainage ditch can be determined,and the soil erosion caused by it can be effectively controlled,and the indicators of prevention and control measures in each project area can reach the predetermined goals.
作者 梁小娟 LIANG Xiaojuan(Zhenping County Water Conservancy Bureau,Zhenping 474250,China)
机构地区 镇平县水利局
出处 《河南水利与南水北调》 2024年第7期6-7,共2页 Henan Water Resources & South-to-North Water Diversion
关键词 水土保持 工程措施 植物措施 soil and water conservation engineering measures plant measures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部