摘要
研究以下湖安置型商品房二期工程为例,分析了项目的铝模板安装方案,阐述全钢爬架的安装、提升、拆除工艺等关键施工工艺,总结组织保障、落实检验查收等注意事项,以期实现高效的技术融合,助推建设安全质量的稳步提升。
Taking the second phase of the lake resettlement type commercial housing project as an example,this article analyzes the aluminum template installation plan of the project,elaborates on the key construction processes such as the installation,lifting,and dismantling of the all steel climbing frame,summarizes the organizational guarantee,implementation of inspection and inspection,and other precautions,in order to achieve efficient technological integration and promote the steady improvement of construction safety and quality.
出处
《建筑技术开发》
2024年第9期15-17,共3页
Building Technology Development
关键词
全钢爬架
铝模板
模板安装
all steel climbing frame
aluminum template
template installation