期刊文献+

框架式通道涵顶进下穿既有铁路施工技术研究

RESEARCH ON CONSTRUCTION TECHNOLOGY OF FRAME TYPE CHANNEL CULVERT TOP ENTERING AND UNDERCROSSING EXISTING RAILWAYS
下载PDF
导出
摘要 随着我国铁路运输需求的快速增长,既有铁路的扩能改造工程也随之增多,在增加铁路线路的同时,受地方经济发展的限制,有越来越多的地方规划道路需上跨或下穿既有铁路,以解决地方交通出行。研究结合既有成昆线改造过程中施工的1~6 m×4.8 m通道式框架涵,以顶进式下穿施工为例,分析了框架涵下穿既有铁路顶进施工技术,以期为同类工程提供借鉴。 With the rapid growth of railway transportation demand in our country,the expansion and renovation projects of existing railways have increased.While increasing railway lines,more and more local planned roads need to cross or underpass existing railways to solve local transportation problems due to the limitations of local economic development.The study combines the construction of a 1-6m×4.8m channel type frame culvert during the renovation process of the existing Chengdu Kunming railway,and takes the top-down construction technology as an example to analyze the top-down construction technology of the frame culvert under the existing railway,in order to provide reference for similar projects.
作者 侯政宇 Hou Zheng-yu
出处 《建筑技术开发》 2024年第9期119-121,共3页 Building Technology Development
关键词 框架式通道涵 下穿既有铁路 顶进施工技术 frame type channel culvert underpass through existing railway jacking construction technology
  • 相关文献

参考文献3

二级参考文献11

  • 1中华人民共和国铁道部.铁办[2005]133号铁路营业线施工和安全管理规定[S].北京:中国铁道出版社,2005.
  • 2北京铁路局.京铁师[1993]491号顶进式框架立交桥设计、施工若干规定[R].北京:北京铁路局,1993.
  • 3北京铁路局.京铁师[2005]455号营业线施工管理及安全实施细则[R].北京:北京铁路局,2005.
  • 4北京铁路局.[2005]108号北京铁路局路外工程管理办法[R].北京:北京铁路局,2005.
  • 5石家庄市市政建设总公司.CJJ74-1999城镇地道桥顶进施工及验收规程[S].北京:中国建筑工业出版社,1999.
  • 6铁道第四勘察设计院桥隧处.桥涵顶进设计与施工[M].北京:中国铁道出版社,1983.
  • 7佘彬泉,陈传灿.顶管施工技术[M].北京:人民交通出版社,1998
  • 8《公路施工手册》编写委员会.公路施工手册(桥涵)[M].北京:人民交通出版社,2000
  • 9TB10203-2002.铁路桥涵施工规范[S].[S].,..
  • 10铁建设[2008]14号,改建既有线和增建第二线铁路工程施工技术暂行规定[S].