某深大基坑周边环境及地下管线复杂,地质条件相对较差,为保证基坑施工任务的顺利进行,首先对基坑围护结构方案进行比选,然后在施工中对重点工序进行控制,同时加强基坑变形监测,最终完成了基坑施工任务。
The surrounding environment and underground pipelines of a certain deep foundation pit are complex,and the geological conditions are relatively poor.In order to ensure the smooth progress of the foundation pit construction task,the first step is to compare and select the retaining structure scheme of the foundation pit.Then,key processes are controlled during construction,and deformation monitoring of the foundation pit is strengthened.Finally,the foundation pit construction task is completed.
出处
《建筑技术开发》
2024年第9期150-152,共3页
Building Technology Development
关键词
水泥土搅拌墙
钻孔灌注桩
基坑稳定性
变形控制
cement soil mixing wall
bored cast-in-place piles
excavation stability
deformation control