研究通过对福州某项目预制桩淤泥层处理进行了分析,高层建筑基础设计中采用预制桩基础,在淤泥层过后的情况下应采取相应处理,待地基处理后取得了较好的经济效益和社会效益,以期为类似工程提供借鉴。
The study analyzed the treatment of precast pile silt layer in a project in Fuzhou.Prefabricated pile foundation is used in the foundation design of high-rise buildings,and corresponding treatment should be taken after the silt layer.After the foundation treatment,good economic and social benefits have been achieved,in order to provide reference for similar projects.
出处
《建筑技术开发》
2024年第9期152-154,共3页
Building Technology Development
关键词
预制桩
淤泥层
水泥土搅拌桩
precast pile
silt layer
cement soil mixing pile