齐鲁黄河大桥边跨钢箱梁滑移顶推技术

Sliding and Incremental Launching Technology of Side Span Steel Box Girder of Qilu Yellow River Bridge
原文传递
导出
摘要 齐鲁黄河大桥上部钢箱梁采用顶推施工工艺。受施工红线及现场地形限制,在19号墩位置设置顶推平台,完成主跨420 m及边跨280 m钢箱梁顶推施工,但S95 m跨上部钢箱梁无法使用顶推施工工艺进行施工。项目结合现场实际情况,创新设计了一种钢箱梁滑移顶推技术,对S95m跨上部钢箱梁进行安装。介绍了齐鲁黄河大桥采用的边跨钢箱梁滑移顶推技术,为今后类似施工提供借鉴和参考。 The upper steel box girder of Qilu Yellow River Bridge adopts the launching construction technology.Due to the construction boundary line and site terrain restrictions,a launching platform is set at the No.19 pier to complete the launching construction of the steel box girder with a main span of 420 m and a side span of 280 m,which affects the construction of the upper steel box girder of S95m span.According to the actual situation on site,a steel box girder sliding jacking technology is innovated and designed to install the S95m steel box girder.In this paper,the sliding & incremental launching technology of side span steel box girder used in the Qilu Yellow River Bridge is described,which can provide reference for similar construction in the future.
作者 米晓婷 李文举 姜宏丽 赵辉 任雅辉 侯守军 MI Xiao-ting;LI Wen-ju;JIANG Hong-li;ZHAO Hui;REN Ya-hui;HOU Shou-jun(Shandong Yifangda Construction Project Management Co.Ltd.,Jinan 250000,China;CCCC Second Highway Engineering Co.Ltd.,Xi'an 710065,China;Jinan City Construction Group Co.Ltd.,Jinan 250000,China;Jinan Municipal Public Assets Management and Operation Co.Ltd.,Jinan 250000,China)
出处 《公路》 北大核心 2024年第8期36-39,共4页 Highway
关键词 桥梁工程 齐鲁黄河大桥 钢箱梁施工 滑移顶推 bridge engineering Qilu Yellow River Bridge steel box girder construction jacking slip
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部